πŸ‡ΊπŸ‡Έ USAJobs.work

America's Job Portal

← Back to USA Jobs

Construction Programme Lead - Resident Engineer (Bridge)

Company

SMEC (an SJ Group company)

Location

Remote, Remote

Posted

July 12, 2026

Position Overview

SMEC (an SJ Group company) is seeking a Senior Assistant Resident Engineer to oversee construction at the Msikaba River Bridge site in Eastern Cape. This role involves detailed programme monitoring, contract administration, and managing technical/contractual site aspects. Candidates must have extensive experience with CCS Candy and a relevant engineering degree. The position requires 6 to 15 years in construction supervision, with at least 5 years on major infrastructure projects.

Ready to Apply?

Join thousands of Americans building their careers

Apply Now