πŸ‡ΊπŸ‡Έ USAJobs.work

America's Job Portal

← Back to USA Jobs

Electrical Engineer III

Company

US Tech Solutions, Inc.

Location

Bakersfield, California, United States

Posted

May 16, 2026

Position Overview

Duration: 12 Months



Note: Travel - about 20% during the duration of the project.



Job Description:




  • Minimum of 7 years of experience in Transmission & Distribution substation engineering for electric utilities specifically PG&E and renewable energy power plants and projects experience as an Electrical Project Engineer in substation type applications, including primary (outdoor) physical substation design and required studies.




Key Responsibilities:


  • Hands-on experience in producing power single line drawing, substation plan and elevation drawings, general substation arrangement and layout, equipment erection drawings, construction details, and layouts for high voltage bus, cable, high voltage equipment, conduit, cable, and wiring, auxiliary power, grounding, and control building layouts.

  • <...

Ready to Apply?

Join thousands of Americans building their careers

Apply Now