Project: Dubai Tram
Location: Al Sufouh Dubai
Timing: Shifting
Duration of Project: 12 MONTHS EXTENDABLE
Location of Work: Dubai Tram depot and stations
Tools: Will be provided by CLIENT
Certificate: Electrical accreditation certificate (L1V and LR)
Accreditations for Specific Low-Voltage Interventions
- L1 and L2 : Permit low-voltage maintenance and repair work with L2 allowing supervision of teams.
- For any maintenance tasks under L1 and L2 installations must be locked out and secured before work begins.
- LR : Authorizes troubleshooting and live low-voltage interventions on small-scale facilities such as electric panel and for operations such as troubleshooting or short-time periods and the main circuit breaker must not exceed 63A.
- LC (Person in Charge of Lockout): Responsible for locking out the installa...