🇺🇸 USAJobs.work

America's Job Portal

← Back to USA Jobs

Repair and Repainting of Existing PU Jogging Track - ZAZEN ONE

Company

Iskaan Tech

Location

dubai, dubai emirate

Posted

July 10, 2026

Position Overview

Repair and Repainting of Existing PU Jogging Track - ZAZEN ONE

  • Carry out a detailed inspection of the existing PU jogging track and identify all areas requiring repair and surface preparation.
  • Prepare the existing surface by cleaning and removing loose particles, dust, dirt, and any deteriorated coating to ensure proper adhesion of the new paint.
  • Apply suitable filler compound to damaged or uneven areas, wherever required, to achieve a smooth and uniform surface prior to painting.
  • Repair chipped, cracked, or damaged edges of the jogging track to restore the original profile and finish.
  • Repaint the existing Polyurethane (PU) jogging track with specialized PU-based coating over an approximate area of 566 m² (Length: 283 m × Width: 2 m ).
  • Apply the paint in Red color, ensuring an even, uniform, and durable finish throughout the entire jogging track.
  • Use high-quality specialized...

Ready to Apply?

Join thousands of Americans building their careers

Apply Now