Transfer Pump No. 2 Control Panel Rectification - THE SPIRIT
Break Down Posted On: July 9, 2026 Closing On: July 13, 2026
JOB REFERENCE: JB
Scope of Work:
- Supply and replace Panel Contactor 220V β 03 Nos.
- Supply and replace Auxiliary Contactor with Timer β 02 Nos.
- Supply and replace Overload Relay β 01 No.
- Supply and replace Pneumatic On-Delay Timer β 01 No.
- Supply and replace 63A MCCB (Moulded Case Circuit Breaker) β 01 No.
- Rectify the control panel fault by replacing the defective electrical components.
- Test and commission the control panel to ensure proper operation.
- Restore Transfer Pump No. 2 to normal operating condition.
- Include all labour, materials, consumables, tools, testing, commissioning, and site cleaning required for the complete execution of the work.
...